Embed Code

close

Photo Gallery: First Siding Goes Up on Walls (May 22,... 5/22/2012
backforward
Embed This
Previous Gallery: Summit League Tournament vs.... Next Gallery: Bison vs. Notre Dame, NCAA...
  • 426 640 Ellig Indoor Track Construction Brown steel siding covers the lower portion of the west wall of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434980 Ryan Perreault Buy Photo
    426 640 Ellig Indoor Track Construction Brown steel siding covers the lower portion of the south wall around two emergency exits at the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434977 Ryan Perreault Buy Photo
    426 640 Ellig Indoor Track Construction A view toward the Fargodome of the Shelly Ellig indoor track and field facility's southeast walls Tuesday, May 22, 2012. 206434973 Ryan Perreault Buy Photo
    426 640 Ellig Indoor Track Construction Three workers fasten a piece of siding on the northeast corner of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434979 Ryan Perreault Buy Photo
    426 640 Ellig Indoor Track Construction A view inside the north wall of the Shelly Ellig indoor track and field facility, where more than half of the floor space is still sand Tuesday, May 22, 2012. 206434978 Ryan Perreault Buy Photo
    640 432 Ellig Indoor Track Construction Rolls of insulation are piled up on the sand floor of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434975 Ryan Perreault Buy Photo
  • 426 640 Ellig Indoor Track Construction Pavement is removed from the 'R' parking lot in preparation for utility work west of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434972 Ryan Perreault Buy Photo
    640 432 Ellig Indoor Track Construction A backhoe digs out pavement in preparation for utility work west of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434971 Ryan Perreault Buy Photo
    426 640 Ellig Indoor Track Construction Pipes are in place through the concrete floor on the east side of the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434976 Ryan Perreault Buy Photo
    179 640 Ellig Indoor Track Construction A view from atop the Bison Sports Arena looking southwest over the Shelly Ellig indoor track and field facility Tuesday, May 22, 2012. 206434974 Ryan Perreault Buy Photo
1/10
 
 
 
 
©2014 - North Dakota State University.    All rights reserved.