Embed Code

close

Photo Gallery: Inside Taking Shape at Indoor Track and... 7/23/2012
backforward
Embed This
Previous Gallery: NDSU Football Media Day (Aug.... Next Gallery: Amy Anderson World University...
  • 426 640 Indoor Track Construction An opening above the main entrance of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767388 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Light fixtures and an overhead door opening on the northeast side of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767386 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction A light fixture and space for signage on the east side of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767387 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Workers build walls around the ticket window and concession stand inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767383 Ryan Perreault Buy Photo
    640 438 Indoor Track Construction Plumbing fixtures in the wall of a private restroom in the lobby of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767400 Ryan Perreault Buy Photo
    433 640 Indoor Track Construction One of the two public restrooms inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767393 Ryan Perreault Buy Photo
  • 426 640 Indoor Track Construction Plumbing fixtures in the wall of one of the public restrooms inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767395 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Plumbing fixtures in the wall of one of the public restrooms inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767396 Ryan Perreault Buy Photo
    432 640 Indoor Track Construction Concrete dries as workers level and pack the sand floor and hang insulation inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767384 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Concrete dries inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767401 Ryan Perreault Buy Photo
    432 640 Indoor Track Construction Workers hang insulation on the southwest corner wall inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767389 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction A worker buries conduit under the sand floor of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767397 Ryan Perreault Buy Photo
  • 426 640 Indoor Track Construction A worker levels and packs sand on the floor of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767398 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Workers lay a yellow barrier over the sand floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767402 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Two sand pits for jumping events are poured level with the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767391 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Two sand pits for jumping pits are poured level with the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767390 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Conduit for a future scoreboard runs up the north and south walls of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767399 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Lights and fans hang from an all-white ceiling inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767392 Ryan Perreault Buy Photo
  • 426 640 Indoor Track Construction Framing for an overhead door that will separate the storage area from the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767394 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Air handlers are installed in the northeast corner storage area inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767381 Ryan Perreault Buy Photo
    640 426 Indoor Track Construction An electrical panel in the northeast corner of the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767382 Ryan Perreault Buy Photo
    426 640 Indoor Track Construction Looking from the northeast corner of the competition floor inside the Shelly Ellig indoor track and field facility Monday, July 23, 2012. 206767385 Ryan Perreault Buy Photo
1/22
 
 
 
 
©2014 - North Dakota State University.    All rights reserved.